tool name

close
tool goes here

Merritt likes post-and-beam plan

Here are recent posts from The News Tribune’s Political Buzz blog. For the inside scoop on government and politics go online to blog.thenewstribune.com/politics.

Published: 09/28/09 12:05 am | Updated: 10/07/09 4:00 pm
0 comments

I shadowed Tacoma mayoral hopeful Jim Merritt for several hours during a typical campaign day recently, collecting string for an eventual profile I’ll do of the two candidates in the mayor’s race.

During one of Merritt’s stops, he met at the Mystic Mocha Cafe with one of his biggest supporters, Dome District construction firm owner Keith Stone. Stone and Merritt had called the meeting to discuss Sound Transit’s D to M Street rail project with two structural engineers.

The reason? Merritt is forging ahead with getting an alternative “post-and-beam” design plan drafted of the project – even though Sound Transit has said it intends to use a different design plan that is now about 75 percent complete.

The Sound Transit proposal largely plans to install an earthen berm to elevate the commuter tracks through the Dome District, allowing the connection of existing and new tracks over the roughly 1.4 miles from D to M Street as part of the planned Sounder commuter train’s Lakewood line.

In what’s becoming the linchpin issue of his campaign, Merritt – who insists the berm design will be bad for aesthetics and future development of the Dome District – is trying to keep the post-and-beam idea alive.

Along with Stone, Merritt’s input to the structural engineers has them now working on a formal post-and-beam design draft. The work, largely being done on a volunteer basis at this point, will help determine if a post-and-beam plan is a feasible and cost-effective model, Merritt said.

“If post-and-beam’s cost (is too much) and gets blown out of the water by the other proposal, that’s a chance I’ve got to take,” Merritt said. “Then I’ll be willing to back off.”

“But I really don’t think that will happen,” he added. “It’s too simple of a design.”

Merritt contends providing a formal alternative design plan will finally give the public a chance to see for themselves how post-and-beam stacks up with Sound Transit’s preferred berm design.

Lewis Kamb, The News Tribune

Similar stories:

  • Rail bridge built, Pacific Avenue reopens

  • Sound Transit: New route to serve Sumner

  • $24 million study to bring light rail to Federal Way broached

  • Puyallup, Sumner first in line for Sounder-stop upgrades

  • Puyallup, Sumner first in line for Sounder-stop upgrades

JOIN THE DISCUSSION | Register here

We welcome comments. Please keep them civil, short and to the point. ALL CAPS, spam, obscene, profane, abusive and off topic comments will be deleted. Repeat offenders will be blocked. Thanks for taking part — and abiding by these simple rules. A thorough explanation of rules of conduct can be found in our Terms of Service. If you have any questions, including why your comment may not be showing immediately after you submit it, be sure to visit the commenting FAQ.

The News Tribune had 65,641 visitors yesterday

South Sound Cars .com
VIEW ALL »

Presented By
Car Pros

2011 Kia Optima LX
Silver color, 23,944 miles

South Sound Rentals .com
VIEW ALL »

Hunters Glen

Welcome to where quality and comfort meet.
Enjoy such amenities as weight equipment, a racquetball court, a sauna, and a Jacuzzi. Our professional management and