tool name

close
tool goes here

Boeing engineers to begin vote on strike next week

Just when Boeing really needs its engineers, they’re voting on whether to strike.

Published: Feb. 2, 2013 at 12:05 a.m. PST
0 comments

Just when Boeing really needs its engineers, they’re voting on whether to strike.

It’s bad timing for Boeing. The aircraft maker is working around the clock to solve battery problems that have grounded its 787s around the world, and unionized engineers are a big part of that effort.

The vote begins Tuesday and runs through Feb. 19. The union has recommended that its members reject Boeing’s contract proposal, hoping the company offers something better, or they may strike.

The strike threat is growing just as Boeing is dealing with a host of other problems. It must mollify airlines frustrated about buying a $200 million plane they can’t fly, and it needs to fix the battery problem. U.S. regulators have launched an open-ended review of the 787’s design and construction. And Boeing needs to speed production of the 787 and other planes.

Last month a battery on a parked 787 caught fire in Boston. Then on Jan. 16, another 787 had to make an emergency landing in Japan after another battery problem. All 50 787s that Boeing had delivered so far are grounded until the issue is solved.

Boeing has said that fixing the 787 is taking its full effort.

The effort includes hundreds of members of the Society of Professional Engineering Employees in Aerospace, the union’s executive director, Ray Goforth, said in an interview on Wednesday. The union represents some 23,000 workers at Boeing.

Goforth said the grounding “shifted a lot of leverage to us.” But workers wanted to keep things simple and not take advantage of Boeing’s situation, he said, so they dropped the improvements they had been seeking in favor of extending the contract.

Boeing’s counteroffer — the one the union will vote on — mostly does that. However, Boeing wants to drop traditional pensions for future hires, replacing them with 401(k) plans. Boeing also declined to make two changes that SPEEA wanted that it said would help preserve current retirement benefits. The union sees those as major give-backs that mean the offer should be rejected.

JOIN THE DISCUSSION | Register here

We welcome comments. Please keep them civil, short and to the point. ALL CAPS, spam, obscene, profane, abusive and off topic comments will be deleted. Repeat offenders will be blocked. Thanks for taking part — and abiding by these simple rules. A thorough explanation of rules of conduct can be found in our Terms of Service. If you have any questions, including why your comment may not be showing immediately after you submit it, be sure to visit the commenting FAQ.

CONTESTS

Similar stories

  • Boeing’s profits defy expectations at nearly $4 billion

    The Boeing Co. reported fourth-quarter profits that beat analyst predictions by 9 cents a share Thursday and predicted higher 2013 earnings without a significant hit from the battery problems that have grounded its 787 fleet.

  • Boeing technical workers planning next course of action

    The union for Boeing’s technical workers is planning its next move after members rejected a contract offer, splitting with engineers represented by the same union who approved the deal.

  • FAA reviews Boeing’s robust retrofit plan for grounded 787s

    WASHINGTON – Boeing attempted a major step Friday toward getting its 787 Dreamliners flying again, proposing a fix for the plane’s troubled batteries that could allow the flights to resume as early as April, congressional officials said.

  • 787 battery fire correction may take long time

    When a Cessna business jet equipped with lithium ion batteries caught fire in 2011 while it was hooked up to a ground power unit, Cessna and the Federal Aviation Administration moved swiftly to address the safety issues involved.

  • Confusion, controversy reign in Dreamliner battery saga

    WASHINGTON — At the same time the government certified Boeing’s 787 Dreamliners as safe, federal rules barred the type of batteries used to power the airliner’s electrical systems from being carried as cargo on passenger planes because of the fire risk.