More Videos

The secret to never getting a turn signal ticket 0:33

The secret to never getting a turn signal ticket

Blizzard conditions shut down Hurricane Ridge visitor center 0:19

Blizzard conditions shut down Hurricane Ridge visitor center

See the latest drone footage of Rattlesnake Ridge crack 2:31

See the latest drone footage of Rattlesnake Ridge crack

Autumn eye candy 0:59

Autumn eye candy

A good-natured brush-off of Amazon 0:13

A good-natured brush-off of Amazon

An underground drone flight from the Space Needle to CenturyLink Field 2:40

An underground drone flight from the Space Needle to CenturyLink Field

Coho salmon dying from pollution 0:36

Coho salmon dying from pollution

Curious cougar caught on camera at high school 0:57

Curious cougar caught on camera at high school

Graffiti-marred idyllic outdoor rec locale to get facelift 2:54

Graffiti-marred idyllic outdoor rec locale to get facelift

Highlights: Jaelyn Turner’s 25 points lifts Life Christian over Orcas Island for first state win in school history 2:08

Highlights: Jaelyn Turner’s 25 points lifts Life Christian over Orcas Island for first state win in school history

Building the lower road in Seattle’s new double-deck tunnel

Seattle’s new SR 99 tunnel has a stacked roadway inside. Crews recently finished pouring the upper southbound roadway. Now the lower northbound road is under construction as shown in this time-lapse footage. Unlike the top deck, the lower surface is built with concrete panels constructed off-site, each one weighing 22 tons. The pre-made panels are trucked into the tunnel, lifted with a specialized crane and joined together to create a functioning highway. The tunnel was created by the huge drilling machine Bertha as part of the $3.2 billion Alaska Way Viaduct Replacement Program that is scheduled to be complete in 2023. Video courtesy of WSDOT.
Courtesy